Home Product ACS Pyri-tos 300 SC

ACS Pyri-tos 300 SC

Ürünlere Geri Dön

Product Model

Fungicide

Description

Active Ingredient: 300 g/L Pyrimethanil

Formulation: Suspension Concentrate (SC)

Label

Download

Security Information Form

Download

Crop name

Harmful Organisms

Application Dosage

The time between the last application and the harvest

Vineyard

Grey mold ( Botrytis cinerea )

100ml/100L water

21 days

Tomatoes

Grey Mold ( Botrytis cinerea )

125ml/100L water

3 days

Apple

Apple scab ( Venturia inaequalis )

50ml/100L water

14 days

Pepper (Greenhouse)

Grey Mold ( Botrytis cinerea )

125ml/100L water

3 days

*It is not used in vineyard areas where vine leaves will be harvested for consumption purposes.

Usage Form

Vineyard - Grey Mold:

In the Mediterranean, Central Anatolia, Black Sea and Southeastern Anatolia Regions;

  1. 1st application: At the beginning of maturity of the grains,
  2. 2nd and other applications: Should be done by taking into account the effect period of the product used (10-15 days apart). Attention should be paid to the time that should pass between the last application and harvest.
  3. In the Aegean, Marmara and Eastern Anatolia Regions;

1st application: Just before flowering,

2nd application: During the closed cluster period,

3rd and other applications: Attention should be paid to the time required between the last application and harvest.

Tomato - Gray Mold:

Application should be started when the first signs of disease are seen in the environment or when the plants are in the flowering phase. Applications are continued at 10-day intervals according to the course of the disease. Application should be done in a way that provides good coverage.

Apple - Apple Smudged :

1st application: When the flower buds swell (3-5 days before in places with branch rows),

2nd application: During the pink rosette bud period (when the flowers are seen separately),

3rd application: When 70-80% of the flower petals have fallen and other applications should be made when the climatic conditions are suitable for the progression of the disease, taking into account the duration of effect of the product used.

4. and other applications: In cases where climatic conditions are suitable for the progression of the disease, applications should be made at 10-14 day intervals, taking into account the duration of effect of the plant protection product used.

Pepper (Greenhouse) Gray Mold:

Application should be started when the first signs of disease are seen in the environment. Application should be done at 10-day intervals. Application should be done in a way that provides good coverage.

Similar Products

ACS Prodius WG

Review

ACS Tıram Forte

Review

Dark Blue 50 WP

Review

ACS Fosetal 80 WP

Review